The roofer you trusted now builds kitchens. Free in-home consultation — scoped in writing. Calls answered 24/7 · (240) 880-2108Office · (240) 880-2108office@udroofing.com
United Developers · Kitchen Remodeling

Kitchen remodeling in Bethesda, scoped like a contract.

From cabinet-and-counter refresh to full gut-and-relayout — Good/Better/Best packages across Maryland, priced in writing, run by one accountable licensed general contractor.

Every kitchen is priced in writing at a free in-home consultation — you get an itemized scope letter, not a guess.

Build your kitchen in our configurator →Book a Free Consultation
139 reviewsA+ BBBMHIC #111971
FREE IN-HOME CONSULTATION

A real scope, a real number — before you commit to anything

  • ✅ On-site measure & layout review with a project specialist
  • ✅ Good/Better/Best options priced against your actual kitchen
  • ✅ Itemized written scope — cabinets, counters, trades, timeline
  • ✅ No-money-down financing illustration, 12–180 months, on approved credit

★★★★★ 139 Google reviews · A+ BBB · MHIC #111971

Free kitchen consultation

30 seconds. A real person confirms within one business hour (8am–7pm).

By submitting you agree United Developers may call or text you about your estimate, including by autodialed/automated means and AI voice. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.

Prefer to talk? (240) 880-2108

Good · Better · Best

Three ways to remodel — priced in writing

We do not publish kitchen prices. Your number comes in writing at the free in-home consultation — cabinet grade, counter material, and layout scope move the price, and we show you exactly how.

Good · Refresh

Kitchen Refresh

Same footprint
  • Cabinets refaced or repainted, new doors & hardware
  • New counters (quartz or granite) & tile backsplash
  • New sink, faucet & garbage disposal — plumbing performed by licensed trade partners
  • Updated lighting & outlets — electrical performed by licensed trade partners
  • Same footprint, same appliances or owner-supplied swaps
Better · Full Remodel

Full Kitchen Remodel

New cabinets, same layout
  • All-new cabinets (semi-custom), soft-close throughout
  • Quartz counters, full-height backsplash, new flooring
  • New appliance package installed & connected
  • Recessed lighting, under-cabinet lighting, new circuits — electrical by licensed trade partners
  • Fixture relocations within the footprint — plumbing by licensed trade partners
Best · Gut + Layout

Gut Renovation & New Layout

New layout
  • Down to the studs — walls opened or removed (engineered beams where load-bearing)
  • Custom or premium semi-custom cabinetry, island with seating
  • Rerouted plumbing & new panel circuits — performed by licensed trade partners
  • New subfloor, flooring, drywall, trim & paint throughout
  • Full permit & inspection package handled by us

Every kitchen is priced by a free in-home consultation with an itemized written scope. For what moves a kitchen’s cost tier by tier, read our kitchen remodel cost guide.

How It Works

Design → permits → build → punch list

1

Design & scope

In-home measure, layout review, and material selections — cabinets, counters, flooring, lighting — priced at Good/Better/Best against your actual kitchen. You get an itemized scope letter and a no-money-down financing illustration.

Free · In writing
2

Permits & ordering

We pull the permits your county requires, order cabinets and materials to the measured plan, and lock the construction schedule around the cabinet lead time — the biggest variable in any kitchen.

We handle the paperwork
3

Build

Demo, framing, and rough-ins first — electrical and plumbing performed by licensed trade partners, then inspected. Cabinets, counters, tile, flooring, and finish work follow in sequence, with dust protection and daily cleanup.

2–12 weeks by tier
4

Punch list & warranty

A walkthrough against the written scope, every punch-list item closed before final payment, and our 2-year workmanship warranty on top of manufacturer warranties — in writing.

In writing
Financing

Your kitchen as a monthly number

No-money-down financing from 12 to 180 months on approved credit — quoted next to your project price at the consultation, so you compare the remodel to the monthly cost of not doing it. See financing options

Build your kitchen in our configurator →

Where the money in a kitchen remodel actually goes

Cabinets are the single biggest line in almost every kitchen. A widely used budget split from the National Kitchen & Bath Association looks like this, and it is the fastest way to sanity-check any quote:

Part of the kitchenShare of a typical budget
Cabinets and hardwareabout 29%
Installation laborabout 17%
Appliances and ventilationabout 14%
Countertopsabout 10%
Flooringabout 7%
Lightingabout 5%
Walls and ceilingsabout 5%
Designabout 4%
Doors and windowsabout 4%
Faucets and plumbingabout 4%

Budget shares are the National Kitchen & Bath Association’s commonly cited breakdown; your kitchen will differ.

The quickest way to save: keep the sink, range and refrigerator where they are. Moving plumbing, gas and venting is where kitchen budgets grow fastest.

The allowance trap, and how to compare kitchen quotes

The lowest kitchen quote is often low because of its allowances: a set amount for cabinets, counters, tile or lighting that you have not picked yet. Set them low and the quote wins, then the real selections cost more and you pay the difference. Before you compare, ask each bidder:

  1. What exactly is included for cabinets: brand, construction, door style, soft-close.
  2. Which numbers are allowances, and how much each one is.
  3. Who pulls the permits and books the inspections.
  4. What is excluded: appliance install, drywall repair, painting, trash removal, temporary kitchen.
  5. How changes are priced once work starts.

Our Good/Better/Best scope letter answers all five in writing.

What you get when UD remodels your kitchen

  1. A free in-home design consult, with your kitchen priced at Good, Better and Best so you choose the level, not the salesperson.
  2. Walls checked before anyone promises to move them. Load-bearing changes get an engineer and a permit, and we tell you before you fall in love with the drawing.
  3. One accountable contractor for cabinets, counters, plumbing and electrical partners, flooring, lighting and paint.
  4. A punch list closed before the final payment. We walk the finished kitchen with you against the written scope.
  5. A written, line-item price. Every part of the job priced as its own line, so you can hold our quote next to anyone else’s and see exactly what is and is not included.
  6. Licensed in Maryland. MHIC #111971. Plumbing and electrical are done by licensed trade partners under permit where the county requires it.
  7. A deposit Maryland law allows. Never more than one-third up front, which is the legal cap.
  8. Changes priced before they happen. If you change the scope mid-job, the change is priced and signed in writing before the work changes. No surprise invoice at the end.
  9. Warranties in writing. Our workmanship warranty is in the contract, and manufacturer warranties are registered in your name.
  10. Financing if you want it. No-money-down options from 12 to 180 months on approved credit, quoted as a monthly number next to the cash price.
  11. A local company you can find. Family-owned since 2005, office in Bethesda, A+ BBB, 4.9 stars on Google. Se habla español.

Every home-improvement contractor working in Maryland must hold an MHIC licence, and you can look one up in under a minute on the Maryland Department of Labor website. Ours is MHIC #111971.

Is a kitchen remodel worth it at resale?

In the Washington, D.C. market in 2025, a minor midrange kitchen remodel (cabinet refacing, new counters, sink, appliances, flooring) returned about 100% of its cost at resale. A major midrange remodel returned about 49%. If you are selling soon, the smaller project pays back. If you are staying, build the kitchen you want to live in.

2025 Cost vs. Value Report (Zonda), Washington, D.C. market, as published by the Journal of Light Construction.

Before you hire anyone: the questions buyers ask us

Where does most of the money go in a kitchen remodel?

Cabinets and hardware are about 29% of a typical budget, installation about 17%, appliances about 14% and countertops about 10%, using the National Kitchen & Bath Association’s commonly cited split.

Why is one kitchen quote so much lower than the others?

Usually low allowances for cabinets, counters or lighting, or items left out such as permits, drywall repair and painting. Ask which numbers are allowances and what is excluded.

Does a kitchen remodel pay for itself?

In the Washington, D.C. market in 2025, a minor midrange kitchen remodel returned about 100% of its cost at resale and a major midrange remodel about 49% (Cost vs. Value Report). If you are selling soon, the smaller project pays back.

How much deposit can a kitchen contractor take in Maryland?

No more than one-third of the contract price, under Maryland Business Regulation § 8-617.

Can I live at home during a kitchen remodel?

Most people do. Plan a temporary kitchen in another room with the refrigerator, a microwave and a coffee maker. We agree the schedule with you up front so you know how long you are without a sink.

How do I check a kitchen remodeler’s licence?

Look up the MHIC number on the Maryland Department of Labor website. Ours is MHIC #111971.

Common Questions

Straight answers

What does a kitchen remodel cost in Maryland?

It depends on the scope, so we do not publish a single number. What moves it most is the cabinet grade, the counter material, whether the sink, range or walls move, and the permits that brings. A refresh, a full remodel and a gut with a new layout are different jobs; we price yours at Good, Better and Best, in writing, after a free in-home consultation.

How long does a kitchen remodel take?

A refresh usually runs 2–3 weeks on site; a full remodel 4–8 weeks; a gut with layout changes 8–12 weeks including permits and inspections. Cabinet lead time is the biggest variable, so we lock the schedule at ordering.

Do I need permits to remodel my kitchen?

If plumbing, electrical, or walls move, yes — Maryland jurisdictions require permits and inspections. We pull the permits and schedule the inspections; electrical and plumbing work is performed by licensed trade partners.

Can you move walls or open the kitchen to the living space?

Yes — the Best tier covers layout changes including load-bearing wall removal with engineered beams, permitted and inspected. That's exactly where a licensed general contractor matters most.

Is financing available?

Yes — no-money-down financing from 12 to 180 months on approved credit, quoted alongside your project price so you see the monthly number before you commit. Details at udroofing.com/financing.

Spec it like a Ferrari, or start with a conversation.

Configure your kitchen scope-by-scope online, or book a free in-home consultation anywhere in Maryland.

Build your kitchen in our configurator →Book a Free Consultation

Prefer to talk? (240) 880-2108

Bethesda & Montgomery County

Who permits a kitchen in Bethesda, Rockville and Gaithersburg

Bethesda is not a city. It is unincorporated Montgomery County, so every permit, plan review and inspection for a Bethesda house runs through the Montgomery County Department of Permitting Services (DPS), 240-777-0311. Montgomery County permits electrical work separately and requires it to be done by a licensed master electrician, so a room that touches wiring is at least two permits, not one. Plumbing and gas are separate again: in Montgomery and Prince George’s counties those permits come from WSSC Water, not the county, and the work has to be done by a WSSC Water-licensed plumber or gasfitter.

Rockville and Gaithersburg are different. Inside Rockville city limits the permit goes through the City of Rockville (240-314-8200), and inside Gaithersburg through the City of Gaithersburg (301-258-6330), not DPS. Getting that wrong at the start costs weeks, so we confirm which side of the line your house sits on before anything is filed.

A kitchen that keeps its existing layout may only need electrical and plumbing permits. Move a sink, a gas line or a wall and a building permit joins them. Kitchens also carry requirements specific to the room, GFCI protection at the counters and dedicated small-appliance circuits, which is why the rough-in inspection has to pass before anything gets closed up.

What a Bethesda kitchen usually needs first

Much of Bethesda inside the Beltway is 1920s–1950s colonials and capes with plaster walls, original single-pane windows and undersized electrical service. On a 1930s house a full kitchen almost always means a service upgrade and new counter GFCI circuits before anything cosmetic happens. Rockville’s 1950s ramblers tend to hide cast-iron or galvanized supply lines. Both go in the written scope up front.

Financing Disclosures

Representative example: $15,000 financed at 9.99% APR for 120 months = approximately $198/month. Total of payments approximately $23,760. Your actual rate, term, and payment depend on the lender, your credit, and the amount financed.

All financing is provided by independent third-party lenders on approved credit. United Developers is a home improvement contractor, not a lender, broker, or financial advisor, and does not make credit decisions or set rates. Rates, terms (12–180 months), and no-money-down availability vary by lender and applicant and are subject to change. Not all applicants will qualify. Full financing disclosures →

We work through winter

We remodel kitchens through the winter in Maryland. It is indoor work, and planning in the fall lets design, ordering and permits finish so the on-site weeks fall after the holidays. See whether winter is a good time to remodel.

Straight answers on kitchens