First: is the frame worth building on?
Most deck remodels start as a surface job and turn into a structural one when the boards come off. Check the ledger where the deck meets the house (bolted and flashed, or nailed and rotting behind), the footings (below the frost line and properly sized) and the joists and connectors. If those are sound, you can resurface. If not, the frame is rebuilt first. Our page on deck replacement options explains how that call is made.
The ideas that pay off
Composite boards on a sound frame. New decking is the biggest visible change, and composite ends the cycle of cleaning and sealing every couple of years. Hidden fasteners and a picture-frame border board make it look finished. See composite vs. pressure-treated.
Better railings. Rails are at eye level and in every photo. Aluminum or composite rail systems last longer than wood balusters, and cable or glass infill keeps the view open where the yard is the point.
Wider stairs and a proper landing. Old deck stairs are often narrow, steep or uneven. Rebuilding them to current code with a landing at the bottom is a safety upgrade you notice every time you carry something down.
Lighting. Low-voltage lights in stair risers and post caps make the deck usable after dark and the stairs safer.
Shade or a roof over part of it. A covered or screened section turns a summer deck into a three-season room. The roof has to be tied into the house and flashed properly, which is where a roofing-born contractor earns its keep. See what decides a covered porch’s cost.
The ideas that add the least
Extra levels and complicated shapes. Each change in level means more framing, footings, rails and steps, and in daily use most families end up on one level anyway.
Built-in benches and planters. They fix the furniture layout permanently, they hold water against the boards, and movable furniture does the same job.
A hot tub on an existing deck. A filled tub is a very heavy point load. It needs its own engineered framing and footings, or a pad at grade, not a spot on the old deck.
Permits, timing and how we build it
In most Maryland counties, new framing, footings, stairs or a roof need a building permit with inspections. We draw the plan, pull the permit and schedule the inspections. Once the permit is in hand, most decks take about one to two weeks on site; covered porches run longer.
MHIC #111971, family-owned since 2005.
Get it looked at, free
We inspect across Maryland — Montgomery, Prince George's, Howard, Anne Arundel, Frederick, Carroll and Baltimore counties. Free inspection, photo report within 24 hours, and the report is yours to keep whether or not you hire us.
